Design-Build Outfall Rehabilitation

Outfall rehabilitation has been one of the big challenges faced by DWSD; the ageing 80 year old system urgently needed a makeover with additional strength and durability support to effortlessly activate the discharge system and keep it running over a period of time. Keeping in mind the project requirements and the earlier challenges faced, we had to brain-storm the way forward, where each detail, every activity and every idea needed to be checked, re-checked and tested several times before implementation.