Michigan Department Of Transportation

By April 22, 2021Projects

Projects

  • Detroit River Pedestrian Walkway – Multi-phased project focused on the Eastern Walkway of the Detroit River, which involved piling work, waterfront repair, floating plant and temporary work platforms, temporary flood/retaining structures and cast-In-place structural concrete for civil work – with environmental protection and vehicle/pedestrian traffic control throughout the project.