Camp Bastian Army Base

By April 22, 2021Projects

Projects

  • $180 million prime contract with the US Air Force, LGC successfully completed the design and construction of a heavy-load aircraft apron (730,870 SF), rotary-wing parking apron (484,376 SF), runway (37,674 SF), runway extension (14,531 SF), circulation and access roads (516,668 SF), pavement markings, edge lighting, grounding, drainage, tie-down points and site improvements.  Also including high-mast apron lighting, site utilities, power production, and electrical connections, along with perimeter fencing, circulation and access roads.