Projects Provide alterations to an existing F-35 aircraft hangar. This project includes the demolition of 19,913 SF of hangar shop space and reconfiguration of this area for F-35 aircraft maintenance…
Projects Property Management & Maintenance – Provide maintenance and property management coordination throughout facilities to ensure safe, quality conditions to improve overall staff and patient experiences.
Projects Performed hazardous material surveys, studies and reports across numerous property locations throughout Detroit. Surveys intended to verify and quantify, to the extent possible, any asbestos-containing pipe insulation and pipefitting,…
Projects Provide the Metropolitan Transit Authority (METRO) with all the necessary personnel, equipment, supplies and supervision to ensure clean , safe, attractive interior, exterior and surrounding areas of METRO bus…
Projects Sewerage Metering Facility Rehabilitation & Repair – Performed rehabilitation and repair of the sewerage metering facility, to include the replacement of 48” to 54” influent/effluent sewers, construction of 3…
Projects Detroit River Pedestrian Walkway – Multi-phased project focused on the Eastern Walkway of the Detroit River, which involved piling work, waterfront repair, floating plant and temporary work platforms, temporary…
Projects $180 million prime contract with the US Air Force, LGC successfully completed the design and construction of a heavy-load aircraft apron (730,870 SF), rotary-wing parking apron (484,376 SF), runway…