Watermain Improvements

Watermain Improvements

Back to Projects The DWSD called upon us for the improvement of the watermains and sewers spread at various locations in the City of Detroit. Improvement in the Watermains ranged from 8” to 24” diameter covering a total of 2600 feet. The skills called for included...
Shoreline Protection for Pedestrian Walkway

Shoreline Protection for Pedestrian Walkway

Back to Projects The Detroit River Pedestrian Walkway Project was conceived to run through a series of phases considering the work volume and the time it would require to be completed. The Eastern Walkway involved the work of pilings, building of a lakefront, floating...
Refurbishment of Belt Filter Presses

Refurbishment of Belt Filter Presses

Back to Projects Decommissioning and removal for 4 Komline Sanderon Belt Filter Presses (BFP) from the Detroit Waste Water Treatment Plant (DWWTP) for offsite shipment was done with exceptional efficiency by our team of specialists. The ageing and dilapidated...
Asset Maintenance

Asset Maintenance

Back to Projects The Detroit Water and Sewerage Department (DWSD) has a water network of more than 2700 miles and close to 3000 miles of sewer pipes. This makes DWSD one of the largest water and sewer utilities in the United States serving a population of nearly...
Oakwood CSO Control Facility and Pump Station

Oakwood CSO Control Facility and Pump Station

Back to Projects For years, Oakwood did not have a network of rain water escape channels, and a sharp downpour would invariably result in the area around the basement and the streets flooding up due to inadequate sewers. Addressing these issues was not an easy task as...